Programs/Studies


Regional

  • Apex to Mesquite and Moapa Valley Corridor Study
  • Future I-11 Nevada
  • I-15 Central Corridor
  • I-15 Corridor System Master Plan
  • I-15 Mobility Alliance
  • I-15 South Corridor Improvement Sloan Road to Tropicana Avenue Environmental Assessment
  • I-515 Alternatives Development Study
  • I-515 Charleston Boulevard Interchange Environmental Assessment
  • I-80, 2020 Corridor Study
  • I-80 Corridor Systems Management Plan (2014)
  • I-80, 2009 Corridor Study
  • Mt. Rose Highway Corridor Study
  • Proposed Las Vegas Stadium Traffic Assessment
  • Pyramid Highway/US 395 Connection Environmental Impact Statement (EIS)
  • Southern Nevada High-Occupancy Vehicle Plan
  • Southern Nevada Traffic Study
  • US 50 Dayton Operational Study
  • US 50 East Corridor Study 2.1 MB - pdf file
  • US 50 Tahoe East Shore Corridor Management Plan
  • US 395 Land Use Study
  • US 395 Washoe County Corridor Study
  • Western Nevada Study

Innovation and Initiatives

  • Integrated Transportation Reliability Program
  • Pioneer Program
  • Complete Streets Policy - Building Roads For All Users
  • Rest Area Rebuild Program - Rest Area Design Concepts

Traffic Safety Engineering

  • Uncontrolled Crosswalk Treatment Process
  • Safety Management Plans

Statewide

Economy

  • Connecting Nevada - Planning our Transportation Future
  • Cost Allocation Study 2009
  • Goods Movement Study

Environmental

  • Landscape and Aesthetic Corridor Plans
  • Stormwater Management Program

Communications

  • Radio Communications-Nevada Statewide Public Safety Radio System

Click Here for More Information


Interested?

If you are interested in this item and have some questions, feel free send an inquiry.

Our Location

1951 Idaho Street
Elko, Nevada 89801

QR Code
On the Go?
Scan our QR code and use your phone to access our catalog.

Text NDOT to 866-866-5545
Elko Area Chamber Market Place
Nevada Department of Transportation is a proud member of

Elko Area Chamber Market Place

Click Here to Learn More